Electrification Planner
Prime Mover TCO Calculator
Battery-aware depreciation · Depot demand charges · Apples-to-apples financing
Class 8 electric day-cab tractor, 422kWh LFP pack, 322km range, 47,627kg GCWR. Maintenance set at ~35% below the 44t diesel benchmark, in line with ATRI/CARB/DOE reported ranges of 25-40% lower scheduled maintenance cost for battery-electric Class 8 trucks vs diesel.
Total cost
$499.1k
over 5 years
Monthly cost
$8318
per month
Cost per km
$1.11
per kilometer
CO₂ emissions
0.0t
total
Savings vs. 44t heavy long-haul diesel benchmark
$21,585.183
Break-even in 9.3 years
ROI
2.4%
annual return
At 90,000 km/year over 5 years, the A 8TT beats the 44t heavy long-haul diesel benchmark on total cost.
Want a full TCO report for your prime mover fleet?
We model the numbers, our vehicle, financing, and depot build-out partners handle the rest
Unlock the Full Electrification Planner
Get access to real-time calculations and custom fleet scenarios.
What's Behind the Lock?
Unlock powerful insights with these advanced features
Demand Charge Optimization
Smart charging schedules that cut peak demand costs by up to 40%
Real-World Mileage Scenarios
Compare EV vs diesel with your actual operational data
Ready to Transform Your Fleet Economics?
Visit our booth L3-15 to get the password and experience the full power of the Electrification Planner.
Password required for full access available exclusively at our booth